water treatment needs for the roadway and park projects have been integrated into the permit packages. Currently 5 permit packages are proposed. Several of these have been completed and submitted to the permitting entities, and as many as 9 construction plan packages may be produced. Approximately 50 percent of the corridor has plans completed or above 60 percent. These plans will be segregated into multiple plans and be construction ready within a four month window as specific funding is identified.

The specific objectives of this project include the following:
  • Provide 4 travel lanes; 2 northbound and 2
    southbound lanes
  • Improve operational characteristics of corridor using Synchro and HCS
  • Reduce site specific crash reduction
  • Evaluate the existing strain poles and lighting system
  • Implement general safety modifications
  • Upgrade to current geometric design standards
  • Improve access management within the corridor
  • Resolve maintenance issues
  • Address ADA issues along the corridor
  • Improve intersection radii and drainage